Skip to main content

ALL-Streams HTO project, OFWAT Water Breakthrough: Catalyst Stream ROUND 4: CIRCULAR ECONOMY DISCUSSION, PRESENTATION

David Inman, Anglian Water, UK

(Free)

Download now


• Funding awarded – £1.53M • Project plan – 18 months (September 2024 – April 2026)

• Pilot scale HTO with downstream refinery processes to be designed, built and operated at Cranfield University

• Full-scale integrated design for Cotton Valley STC (Milton Keynes)

• What is the value proposition for HTO?

Download now

Please fill in your details to download the FREE proceeding.