ALL-Streams HTO project, OFWAT Water Breakthrough: Catalyst Stream ROUND 4: CIRCULAR ECONOMY DISCUSSION, PRESENTATION
David Inman, Anglian Water, UK
(Free)
• Funding awarded – £1.53M • Project plan – 18 months (September 2024 – April 2026)
• Pilot scale HTO with downstream refinery processes to be designed, built and operated at Cranfield University
• Full-scale integrated design for Cotton Valley STC (Milton Keynes)
• What is the value proposition for HTO?