Concept for the reconstruction of the sludge management of the Prague WWTP: PRESENTATION ONLY
Srb, M.1, Sýkora, P.1, Čech, P.1, Lánský, M.1, Rosický, J.2, Jeníček, P.3, Hartig, K.4, and Jindřich, S.5, 1Pražské vodovody a kanalizace, 2Pražská vodohospodářská společnost, 3University of Chemistry and Technology Prague, 4Sweco a.s., 5D-plus, Czech Republic
(Free)
Future
• Refurbishment of Existing water line (2024-2028)
• Following reconstruction of sludge management
• Planned capacity 1.5 mil PE
Current setup
Two stage anaerobic thermophilic digestion
• Mechanical disintegration via lysating centrifuge
• Dewatered sludge meets land application requirements
• Biogas valorisation
o Main CHPs (Combined Heat and Power Units)
o Bio-methane plant