Skip to main content

Opportunities for stormwater treatment – design, construction and operational experiences of United Utilities’ first stormwater wetland at Southwaite WwTW: PRESENTATION ONLY

Jessica Betts, Graduate Process Engineer, United Utilities, UK

(Free)

Download now


Southwaite WwTW
Existing Works and Drivers

  • Located near Carlisle, 1 km NW of Southwaite service station.
  • Design population equivalent of 972 (domestic pop. 150)
  • Treat All Flows (TAF) works, with a future 1 in 30 year flow of 26 l/s
  • Driver is to achieve WINEP objectives and good status in the River Petteril • Existing works (trickling filter, humus tanks) are aging, hydraulically overloaded and overtopping.

Download now

Please fill in your details to download the FREE proceeding.